AMC cost calculator

Price an annual maintenance contract from what it really costs you to deliver: visits, travel, breakdown calls, parts, overhead and margin, with GST added. Buyers can use it to sanity-check a quote.

Free to useFree sign-up to see resultsRuns in your browser

Last updated 22 October 2026

A technician working on a ceiling-mounted air conditioner
Overview

How do you calculate AMC charges?

Add up what the contract costs you to deliver: preventive visit labour, travel, consumables, expected breakdown calls and, for a comprehensive AMC, parts. Add overhead, divide by one minus your target margin to get the price, then add GST. This calculator does the sum with your own numbers and shows the price per unit.

The calculator

How do you use the AMC cost calculator?

  1. Enter the units the contract covers and choose comprehensive (labour and parts) or non-comprehensive (labour only).
  2. Enter preventive visits a year, time per unit per visit, your loaded labour cost per hour and travel per trip.
  3. Enter how many breakdown calls you expect per unit each year, from your own job history, and the time each takes.
  4. For a comprehensive AMC, estimate parts as a ₹ amount per unit or as a % of the equipment’s value.
  5. Add overhead and your target margin. The GST rate is filled in; change it only if your adviser tells you to.
  6. Select Show results and sign up once with the short free form; the price and cost breakdown then appear.

Your own numbers; no market rates built in. The figures filled in are example values to show how the sum works. Replace every one with your own costs and job times.

The contract
Preventive visits

Salary plus benefits, employer contributions and a share of vehicle and tools, divided by working hours.

Units at the same site are usually done on one trip. Use 1 if every unit is at a different address.

Breakdown calls

Take it from your own job history for this kind of equipment.

Overhead, margin and GST

Office, coordinator, software, insurance and other costs not tied to one job.

Margin on the price, not a markup on cost.

18% is the rate for maintenance, repair and installation services (heading 9987): Notification 11/2017-Central Tax (Rate), entry 25, unchanged in the September 2025 rate changes. Edit it if your adviser says otherwise.

Sign up once to see your results. It's free, and the results open here as soon as the form is sent.

Show results

Everything is calculated in your browser. Nothing you enter is stored or sent; only the sign-up form is.

The maths

How does AMC pricing work?

Every figure comes from your inputs. The calculator adds no market rates, industry averages or benchmarks.

LineFormula
Preventive labourunits × visits a year × hours per unit per visit × loaded labour cost per hour
Preventive traveltrips × travel cost per trip, where trips = (units × visits a year) ÷ units serviced per trip, rounded up
Consumablesunits × visits a year × consumables per unit per visit
Breakdown callsunits × calls per unit a year × (hours per call × labour cost per hour + travel cost per trip)
Parts (comprehensive only)units × parts cost per unit a year, or units × equipment value × parts %
Overheadsum of the lines above × overhead %
Annual cost to deliverdirect cost + overhead
Price before GSTcost to deliver ÷ (1 − target margin %)
GSTprice before GST × GST rate
Per-unit priceprice ÷ units
Cost of one preventive visit(hours × labour cost + consumables + travel ÷ units per trip) × (1 + overhead %)
Breakdowns 50% higherthe same sum with 1.5 × the expected calls, and the margin left at the same price

The margin is a share of the price, not a markup on cost. A 20% margin means dividing cost by 0.8, which is a 25% markup. Mixing the two up is a common way to under-price a contract.

What does the sum look like with the example values?

A non-comprehensive AMC for 10 units, 4 preventive visits a year, 1.5 hours per unit per visit at ₹400 an hour, 5 units per trip at ₹500 a trip, and 1 breakdown call per unit a year. These are illustrations, not typical figures.

LineWorkingAmount
Preventive labour40 unit-visits × 1.5 h × ₹400₹24,000
Preventive travel8 trips × ₹500₹4,000
Consumables40 × ₹150₹6,000
Breakdown calls10 calls × (2 h × ₹400 + ₹500)₹13,000
Overhead15% of ₹47,000₹7,050
Cost to deliver₹54,050
Price before GST₹54,050 ÷ 0.8₹67,563
GST18%₹12,161
Price including GST₹7,972 per unit₹79,724
Contract types

What drives the cost of a comprehensive vs a non-comprehensive AMC?

Cost driverNon-comprehensive (labour only)Comprehensive (labour and parts)
Preventive visit labourIncluded in the priceIncluded in the price
TravelIncluded for scheduled visits and breakdown callsIncluded for scheduled visits and breakdown calls
ConsumablesUsually included; spell out which onesUsually included; spell out which ones
Breakdown callsLabour included; the customer pays for partsLabour and listed parts included
Spare partsQuoted and billed separatelyYour cost, so priced in from parts history or a % of equipment value
Equipment age and conditionAffects call volumeAffects call volume and parts cost; inspect before quoting
Your riskMainly labour hours running overLabour plus parts failures running over the estimate

For the difference between the two in more detail, see CMC vs AMC.

GST

What GST rate applies to AMC charges?

Maintenance, repair and installation (except construction) services fall under heading 9987. Entry 25 of Notification 11/2017-Central Tax (Rate) sets central tax at 9%, so the total is 18%: 9% CGST plus 9% SGST within a state, or 18% IGST between states. The services rate changes recommended by the 56th GST Council in September 2025 did not include heading 9987, so the calculator fills in 18%.

A comprehensive AMC can include parts. Under section 8 of the CGST Act a composite supply is taxed at the rate of its principal supply, but whether your contract is one, or whether parts should be billed separately, depends on how it is written. Ask your tax adviser. General guidance, not tax advice; checked on 22 October 2026.

Woman in a pink blazer working at a laptop in an office
The contract

What should the contract say so the price holds?

A price is only as good as the scope behind it. Put these in writing:

  • Equipment schedule: each unit covered, with make, model, serial number, location and condition at the start.
  • Visits: the number of preventive visits, roughly when they fall, and what each visit checks.
  • Response times: how quickly you attend a breakdown call, within which hours and days, and whether there is a cap on calls.
  • Parts list (comprehensive): which parts are covered, which are excluded (often consumables, glass, plastic body parts, cosmetic items) and whether there is a cap on parts value.
  • Exclusions: damage from misuse, power fluctuations, fire, flood or accidents, relocation, and work by third parties.
  • Price and payment: GST shown separately, payment terms, and how the price changes on renewal.

The AMC contract format lays these out clause by clause.

Man signing a printed document with a pen at a desk
Perimattic

What does Perimattic offer for AMC businesses?

Perimattic Field Service Management is software for Indian service businesses that sell and deliver AMCs. It includes:

  • An AMC contract register with customers, sites, equipment, contract type, dates and value.
  • Preventive visit schedules generated from each contract, with reminders.
  • Breakdown tickets with SLA tracking, and spare parts used on each visit, so next year’s price uses real data.
  • Renewal reminders and quotes, and GST invoices for AMC billing.

Get started: Sign up and our team will walk you through Perimattic Field Service Management for your business.

Technician in a cap working on wiring inside an open electrical panel
FAQs

AMC pricing, answered

How do you calculate AMC charges?

Work out the yearly cost of delivering the contract: preventive visits (labour, travel, consumables), expected breakdown calls and, for a comprehensive AMC, expected parts. Add your overhead. Divide the total by one minus your target margin to get the price before GST, then add GST at the applicable rate.

Why does a comprehensive AMC cost more than a non-comprehensive one?

In a comprehensive AMC the provider also pays for the parts that fail during the year, so the price has to cover expected parts cost and the risk that failures run higher than expected. In a non-comprehensive AMC the customer pays for parts separately, so the price covers labour, travel and consumables only.

What GST rate applies to an AMC?

Maintenance, repair and installation services fall under heading 9987, taxed at 18% (9% CGST plus 9% SGST, or 18% IGST) under Notification 11/2017-Central Tax (Rate). The September 2025 rate changes did not alter this heading. If a comprehensive AMC also supplies parts, ask your tax adviser how to treat them.

Field Service Management

Want every AMC visit, ticket and renewal tracked in one place?

Sign up to tell us how your service team works, and our team will get in touch to show you how it fits.
  • Free consultation
  • No commitment
  • Tailored to your team