SaaS Migration Services With Zero-Downtime
We move legacy applications, on-prem systems, and single-tenant products and applications onto modern cloud and multi-tenant SaaS architecture - with a rollback plan for every stage and sprint, a parallel run before every cutover, and your business running the whole time with zero downtime.
How Do You Know It Is Time to Migrate?
Migrations are triggered and can never be scheduled. If any of this sound familiar to you, an assessment will tell you what a migration will actually costs - and what staying to the current stack will cost.
Which Types of SaaS, Database, and Cloud Migration Do We Handle?
Six types: platform-to-platform, on-prem to cloud, database migration, monolith to multi-tenant SaaS, re-platforming and modernization, and data & user migration. Most engagements combine two or three.
Platform-to-Platform Migration
Moving off a legacy SaaS or custom platform onto a modern stack - all existing features gets mapped, data migration plan and migrated, users migrated in sprints or waves.
On-Prem to Cloud Migration
Applications running on on-prem servers are re-platformed and migrated onto AWS, Azure, or GCP with security, backup, and cost controls built in.
Database Migration
Schema mapping and translation, data integrity check before data transfer, and dual-write windows that let the old and new databases run side by side.
Monolith to Multi-Tenant SaaS
Single-tenant or monolithic products are re-architected for tenancy, billing, and self-serve onboarding for customers — the productization migration.
Re-Platforming & Modernization
Application replatforming makes targeted changes so existing apps run on modern managed cloud platforms — without redesigning the core business logic. Java EE to Spring Boot or Quarkus, .NET Framework to .NET 8, PHP 7 to PHP 8.3; containerization with Docker and Kubernetes; managed databases like Amazon RDS or CloudSQL; and CI/CD with observability from day one. It is the productive middle ground between a lift-and-shift (no benefit) and a full re-architecture (12–18 months of work), and typically claws back 20–40% of infrastructure cost against a three-year TCO comparison.
Data & User Migration
The final mile: accounts, permissions, historical records, and files moved with verification reports and audit trail being built.
How Do We Migrate Without Breaking Your Business Oprations?
Five stages that ensure that your business operations are not disrupted. The system you have relied on keeps running until its replacement and modernized system is fully tested and proven in parallel.
Audit and Inventory
Week 1–2Every application, integration, data store, and scheduled jobs are mapped - including the undocumented ones and a full audit is prepared which gives us an output of an inventory and complexity score per system or module.
Migration Plan + Rollback Plan
Signed off before buildA staged plan with sequencing, cutover windows, and a tested rollback path for every stage or module. No stage begins without a way back.
Parallel Run
Proof before cutover from old applicationThe new system runs alongside the old and against live data initially being fed into both systems for a period. This ensures that all discrepancies in the system surfaces.
Staged and Planned Cutover
Zero downtimeUsers and workloads move in waves and sprints, lowest-risk first. Each wave validates before the next moves. The business and operations never stops.
Hypercare and Handover
30 daysIntensive monitoring, same-day fixes, and knowledge transfer to your team — then a documented handover or an ongoing support retainer.
What Protects Your Data and Uptime During Migration?
Four guarantees on every engagement: 100% data-integrity verification, zero-downtime cutover target, a tested rollback path on every stage, and 30 days of hypercare after go-live.
What Does Staying on Legacy Actually Cost?
60–80% of enterprise IT budgets go to maintaining existing systems, and independent research puts real numbers on the cost of waiting. The four below are the ones every legacy renewal conversation should include.
Rezcomm: Legacy Platform to AWS Microservices
Rezcomm's customer engagement platform — retail, parking, and booking flows for airports — was re-architected from a legacy stack onto AWS microservices. The migration ran in stages while the platform stayed live for airport customers, and Perimattic has maintained and evolved it since 2018.
Platforms and Stacks We Migrate Between
Common sources and targets. If your stack isn't listed, the assessment will map it.
Cloud targets
Databases
Application stacks
DevOps & delivery
How Much Does a SaaS Migration Cost?
Assessment from $750 (2–3 weeks). Full migration $5,000–$15,000 (8–20 weeks). Post-migration support from $500/month. Every engagement is scoped and quoted in writing before work begins.
Migration Assessment
Full inventory, complexity scoring, staged plan, risk register, and a fixed quote for the migration itself. Yours to keep whoever you build with.
Full Migration
The complete migration: build, parallel run, staged cutover, data verification, and 30 days of hypercare. Scope fixed in writing from the assessment.
Post-Migration Support
Monitoring, cost optimization, and continued evolution of the migrated platform — the model Rezcomm has run on since 2018.
What Clients Say About Migrating With Us
“The new architecture is scalable and highly efficient, saving significant fees.”
Perimattic re-platformed our customer engagement systems onto AWS microservices. Their team has been maintaining and evolving the platform since 2018 — production has stayed stable throughout.
“Their professional behavior and around-the-clock stability were impressive.”
Production systems stayed stable 24/7 without us building an in-house ops team. Communication was consistent, and delivery landed on the dates they committed to.
SaaS Migration, Answered
How long does a SaaS migration take?
The assessment takes 2–3 weeks and fixes the answer for your case. Typical full migrations run 8–20 weeks depending on system count, data volume, and integration complexity — delivered in stages, so value lands before the final cutover.
Will we have downtime during the migration?
The target is zero. Staged cutovers with a parallel run mean the old system keeps serving until the new one has proven itself. Where a maintenance window is physically unavoidable — some database switchovers — it is agreed, scheduled, and rehearsed in advance.
How do you prevent data loss?
Verification is built into the process: row counts, checksums, and reconciliation reports on every migrated store, plus a dual-write window where old and new systems both receive changes. The legacy system is never retired until the numbers reconcile and you sign off.
Can we migrate in phases instead of all at once?
Phased is our default. Systems move in order of risk and value — lowest-risk first to prove the pipeline, highest-value early where it pays. Each phase is independently useful, so a paused migration still leaves you better off than when it started.
What happens if something goes wrong mid-migration?
Every stage has a rollback plan that has been rehearsed in staging, not just written down. If a cutover wave misbehaves, traffic returns to the legacy system while the issue is fixed — that is what the parallel-run architecture is for.
Who owns the new environment after cutover?
You do. Cloud accounts, code, infrastructure-as-code, and data are in your name from day one. After hypercare you can hand it to your team with our documentation, or keep us on a support retainer.
How much does a SaaS migration cost?
Published bands: assessment from $750 (2–3 weeks), full migration $5,000–$15,000 (8–20 weeks staged), post-migration support from $500/month. The assessment converts these bands into a fixed written quote for your specific systems.
Can you migrate us and add AI capabilities at the same time?
Yes — migration is often the moment to add them, because clean cloud data is the prerequisite AI projects usually lack. Many clients pair a migration with a scoped AI proof of concept once the data lands on the new platform.
What's involved in a database migration?
Database migration covers schema mapping and translation, data-integrity checks before transfer, and dual-write windows that let the old and new databases run side by side until the new one is proven. We move from legacy SQL, on-prem, or file-based stores onto PostgreSQL or cloud databases (AWS RDS, Aurora, Azure SQL, Cloud SQL) with row-count and checksum verification signed off before the old system is retired.
How do you migrate from on-prem to cloud?
We start with an audit of the on-prem systems, integrations, and data stores, then produce a migration plan with a tested rollback path per stage. Applications are re-platformed onto AWS, Azure, or GCP with security, backup, and cost controls built in — new system runs in parallel against live data before any cutover, and users move in waves rather than a single switch.
Should we lift-and-shift, re-platform, or re-architect?
It depends on where the pain is. Lift-and-shift is fastest when the legacy stack works but the hosting doesn't — you move the runtime, not the code. Re-platforming (containers, managed databases, CI/CD) suits systems that will keep evolving but not being torn apart. Re-architecting to multi-tenant SaaS or microservices is right when the shape of the code is what's blocking scale or productization. The assessment tells you which mix fits your systems.
Can you migrate to AWS, Azure, or GCP?
Yes — all three major clouds. We work with AWS (EC2, ECS, EKS, RDS, Aurora), Azure (App Service, AKS, Azure SQL), and GCP (Compute Engine, GKE, Cloud SQL) and pick the target based on your existing licensing, team skills, and workload profile. Multi-cloud and hybrid setups are also in scope when compliance or vendor-lock-in avoidance requires it.
What's the difference between application replatforming and re-hosting?
Re-hosting (lift-and-shift) moves an application to new infrastructure with no changes at all — same runtime, same architecture, just a different host. Replatforming makes targeted changes so the app can run on a modern managed cloud platform: replacing a self-managed database with Amazon RDS, containerising the application for Kubernetes, or upgrading the runtime from Java EE to Spring Boot without redesigning core business logic. Re-architecting rebuilds the application from the ground up. Replatforming occupies the productive middle ground: more benefit than rehosting, far less risk and cost than a full re-architecture.
When should we replatform an application instead of rebuilding it?
Replatform when the application's core business logic is sound and the problems are at the infrastructure or runtime layer — the runtime is approaching end-of-life (Java EE, .NET Framework, PHP 7), self-managed infrastructure carries high operational overhead, or the business needs cloud-native scaling and managed services without the 12–18 month timeline of a rebuild. Rebuild only when the application has fundamental design problems replatforming cannot fix — a data model that will not scale, tightly coupled logic that blocks independent deployment. A typical replatforming engagement runs six to eighteen weeks per application tier, delivers containerisation, managed database migration, and CI/CD as part of the same engagement, and often eliminates 20–40% of infrastructure cost against a three-year TCO baseline.
Related Services
Learn More Before You Migrate
Know What Your Migration Costs Before You Commit
A migration assessment gives you the inventory, the plan, the risks, and a fixed quote — whether or not you build with us. Engagements open to businesses across the United States and United Kingdom.
