Preventive maintenance schedule: how to build one
Pick the right trigger for each piece of equipment, set intervals from the manual, and lay out a year of visits your team can actually keep.
Last updated 22 October 2026
What is a preventive maintenance schedule?
A preventive maintenance schedule is a calendar of planned service tasks for each piece of equipment, set by time, running hours or measured condition. It lists what is checked, how often, by whom and when. Build it from the manufacturer’s manual first, then adjust for how hard the equipment works on your site.
Which scheduling basis should you use?
Every task in a schedule needs a trigger: the thing that says “do this now”. There are three common kinds, and most sites use all three for different equipment.
| Basis | How it works | Suits | Watch out for |
|---|---|---|---|
| Time-based | Fixed calendar interval: monthly, quarterly, half-yearly | Split ACs, lifts, rooftop solar, most AMC visits | Over-servicing idle equipment and under-servicing busy equipment |
| Usage-based | Running hours, cycles, kilometres or units produced | DG sets, compressors, pumps, vehicles | Needs a reliable hour meter or log, read at every visit |
| Condition-based | Act when a measured value crosses a limit: temperature, vibration, pressure, output | Large chillers, critical motors, solar plants with monitoring | Needs instruments and someone who reviews the readings |
Many manuals combine the first two: “every 250 hours or six months, whichever comes first”. Your schedule should keep both counters and raise the visit on whichever is reached earlier.
How do you build a preventive maintenance schedule?
- List every asset. Customer, site, equipment type, make, model, serial number, installation date and, for engines, the current hour-meter reading.
- Read the manual. Note each maintenance task and its interval. Where the manual is missing, ask the manufacturer or its authorised service centre rather than guessing.
- Pick the trigger for each task from the table above, and adjust intervals for site conditions such as dust, heat, salt air or round-the-clock running.
- Group tasks into visits. A quarterly visit can include the monthly checks, so the technician does one trip, not three.
- Add statutory items separately. Inspections required by law, such as lift inspections, follow your state’s rules and are carried out by the authorities, not by your technician.
- Assign and remind. Each visit needs an owner, a due date and a reminder to both the technician and the customer.
- Review every quarter. Repeat breakdowns between visits mean the interval is too long or a task is missing.
How often is common equipment usually serviced?
The table below is general guidance on how service businesses commonly plan these visits. It is not a substitute for the manufacturer’s manual, which always takes priority, and it does not cover statutory inspections.
| Equipment | Common planning basis | Typical visit pattern in AMCs | Always check |
|---|---|---|---|
| Split and window ACs | Time-based | Filter cleaning often, full service a few times a year, more often in heavy-use or dusty sites | Manufacturer’s manual; site dust and running hours |
| Lifts | Time-based | Routine maintenance visits, commonly monthly, plus breakdown call-outs | Manual, your state’s lift rules and licence conditions |
| DG sets | Usage-based with a calendar backstop | Oil and filter changes by running hours or time, whichever comes first; routine checks and test runs between | Engine manual for hour intervals and oil grade |
| Rooftop solar | Time-based plus monitoring | Module cleaning set by dust and rainfall; periodic inverter, wiring and earthing checks | Module and inverter manuals; generation data |
| Medical equipment | Time-based plus calibration due dates | Preventive maintenance and calibration as set by the manufacturer; regulatory QA where it applies | Manual, the hospital’s quality policy and any regulator’s rules |
What does a sample schedule look like for a mixed site?
Here is an illustrative annual plan for one commercial building with eight split ACs, one passenger lift, one DG set and a rooftop solar plant, all under AMC. The intervals are placeholders to show the layout; set your own from each manual.
| Month | Split ACs | Lift | DG set | Rooftop solar |
|---|---|---|---|---|
| April | Q service: filters, coils, drain, gas pressure | M visit | Monthly check and test run; H service if due | Cleaning; inverter and earthing check |
| May | Filter cleaning | M visit | Monthly check and test run | Cleaning |
| June | Filter cleaning | M visit | Monthly check; H service if due | Cleaning; pre-monsoon wiring check |
| July | Q service | M visit | Monthly check and test run | Cleaning as needed |
| August | Filter cleaning | M visit | Monthly check; H service if due | Generation review |
| September | Filter cleaning | M visit | Monthly check and test run | Cleaning |
| October | Q service | M visit | Monthly check; H service if due | Cleaning; inverter and earthing check |
| November | Filter cleaning | M visit | Monthly check and test run | Cleaning |
| December | Filter cleaning | M visit | Monthly check; H service if due | Cleaning |
| January | Q service | M visit | Monthly check and test run | Cleaning; generation review |
| February | Filter cleaning | M visit | Monthly check; H service if due | Cleaning |
| March | Filter cleaning; renewal survey | M visit; renewal survey | Monthly check; renewal survey | Cleaning; annual report |
The last month carries a renewal survey: a quick look at condition and repeat faults, which you need before quoting next year’s contract. To produce a plan like this for each contract, with dates rather than months, use the free AMC schedule generator.
Why do preventive maintenance schedules slip?
| Cause | What helps |
|---|---|
| Breakdowns pull technicians off planned visits | Keep a fixed share of each day for planned work, and track how many visits were missed each month |
| Nobody is reminded | Automatic reminders to the technician and to the customer a few days before the visit |
| Customer site is locked or not ready | Confirm the visit the day before; record no-access visits so they can be rebooked |
| Running hours are not recorded | Make the hour-meter reading a required field on every DG set job card |
| Schedule lives in one person’s spreadsheet | One shared register of contracts and visits that the whole team can see |
How does Perimattic Field Service Management help with schedules?
Perimattic Field Service Management is built for Indian service businesses that sell AMCs. Each contract in the AMC register generates its own preventive maintenance visits automatically, with reminders to technicians and customers, and technicians complete checklists, photos and customer signatures on a mobile app that works with patchy connectivity. Missed and completed visits show up against each contract.
Sign up to tell us how your team schedules work today.
Keep reading
Preventive maintenance schedules, answered
How often should preventive maintenance be done?
There is no single answer. The manufacturer’s manual sets the minimum for each piece of equipment, usually as a calendar interval, a running-hours interval or both. Heavy use, dust, heat and coastal air shorten the gap. Statutory inspections, such as for lifts, follow the rules of your state, not your schedule.
What is the difference between preventive and predictive maintenance?
Preventive maintenance happens at fixed points: every three months or every 250 running hours, whether or not anything looks wrong. Predictive or condition-based maintenance waits for a measured sign, such as vibration, temperature or a drop in output, and acts before failure. Most service businesses use a mix of both.
Can I make a preventive maintenance schedule in Excel?
Yes, and many small service businesses do. A spreadsheet works for a few contracts. It gets hard to manage once you have dozens of sites, because nobody is reminded when a visit is due and missed visits are only noticed when a customer complains. The free AMC schedule generator gives you a visit plan you can export to a calendar.