Perimattic
Warehouse staff walking down a wide aisle between tall stocked racks

Free Tools

Planning calculators that show the math

Free calculators for forecast accuracy, safety stock, EOQ, inventory turnover, CBM, freight class and pallet loads. Each one shows its formula and walks through a worked example.

Book a Demo

What planning calculators does Demand OS offer?

Perimattic Demand OS offers seven free calculators. Four cover planning: forecast accuracy (MAPE and bias), safety stock and reorder point, EOQ, and inventory turnover. Three cover shipping: the CBM calculator gives cubic metres and chargeable weight, the freight class calculator estimates the NMFC class from density, and the pallet calculator works out cartons per pallet and pallets per load.

Measure the forecast

How far off is your demand forecast?

Every inventory decision inherits the error in the forecast behind it. MAPE tells you how large that error is on average, bias tells you whether it leans high or low, and weighted MAPE stops low-volume items from distorting the picture. Start here when stock is drifting and nobody can say why.

Planner presenting charts on a laptop to colleagues in a meeting

Set the reorder policy

When should you reorder, and how much?

A reorder policy answers two questions for each SKU. Safety stock and the reorder point decide when to place an order, so a demand spike or a late delivery does not leave the shelf empty. Economic order quantity decides how much to order, balancing the cost of placing orders against the cost of holding stock.

Forklift parked between high racks of pallets in a warehouse

Check inventory health

Is your inventory moving fast enough?

Turnover shows how many times a year your inventory is sold and replaced, and days of supply shows how long current stock would last. Together they tell you whether working capital is sitting on shelves, and how your business compares with the typical range for its industry.

Cardboard boxes stored on pallets across rows of metal warehouse racks

Plan the shipment

How much space, and what will it cost to move?

Once you know what to order, the next questions are physical. How many cartons fit on a pallet, how many pallets fit in a trailer or container, and whether the carrier will charge on weight or on space. These calculators answer them before you book.

Aerial view of a container port with gantry cranes over rows of stacked shipping containers

Choose a calculator

Which calculator should you use?

Start from the question you need answered. Each calculator returns a specific number you can act on.

Question you are askingCalculator
How accurate is our forecast, and does it lean high or low?Demand Forecast Accuracy Calculator
How much buffer stock do we need for a 95% service level?Safety Stock Calculator
At what stock level should we place the next order?Safety Stock Calculator
How many units should each order be?EOQ Calculator
Are we paying too much to order or to hold stock?EOQ Calculator
How fast does our inventory sell through?Inventory Turnover Calculator
How do we compare with our industry?Inventory Turnover Calculator
How many CBM is this shipment, and how full is the container?CBM Calculator
What freight class will this LTL pallet be?Freight Class Calculator
How many boxes fit on a pallet, and how many pallets per truck?Pallet Calculator

Formulas

The planning formulas at a glance

These are the formulas the calculators use. D is average demand, LT is lead time, σ is standard deviation, Z is the service-level score (1.65 for 95%), S is the cost per order and H is the annual holding cost per unit.

MAPE

(1/n) × Σ |Forecast − Actual| ÷ Actual × 100

Bias

(1/n) × Σ (Forecast − Actual) ÷ Actual × 100

Weighted MAPE

Σ |Forecast − Actual| ÷ Σ Actual × 100

Safety stock

Z × √(LT × σD² + D² × σLT²)

Reorder point

D × LT + Safety stock

EOQ

√(2 × D × S ÷ H)

Inventory turnover

COGS ÷ Average inventory

Days of supply

365 ÷ Inventory turnover

CBM

L × W × H (m) × Cartons

Air volumetric weight

L × W × H (cm) ÷ 6,000

Freight density

Weight (lb) ÷ (L × W × H in ÷ 1,728)

Cartons per pallet

Cartons per layer × Layers

Beyond the calculator

From one SKU at a time to the whole catalogue

A calculator gives you an answer for one SKU, using the figures you typed in. Demand OS runs the same calculations across every SKU and location and refreshes them as new data arrives. The AI Forecasting Engine tracks accuracy and selects a model per SKU, so the error you measure here is monitored continuously.

Inventory Optimization sets safety stock from that forecast error and from supplier lead time history, against service-level targets you choose by SKU tier, and shows the working capital impact before you commit.

Explore Demand OS
Distribution centre with rows of racking, totes and pallets of stock

Frequently Asked Questions

Planning calculators, answered

Are the Demand OS calculators free?+
Yes. All seven calculators are free to use. You enter your own figures, and the calculator shows your results once you add your name and work email, which is also how a copy of the results reaches you. Every calculator shows the formula it uses, so you can check the math or rebuild it in a spreadsheet.
Which calculator should I start with?+
Start with forecast accuracy if you are unsure, because forecast error feeds every other number. Then use the safety stock calculator to set buffer stock and the reorder point, the EOQ calculator to set order size, and the inventory turnover calculator to check whether the result is freeing up or tying up working capital.
What is the difference between safety stock and EOQ?+
Safety stock decides when to reorder; EOQ decides how much to order. Safety stock is the buffer held to cover demand spikes and late deliveries, and it sets the reorder point. EOQ is the order size that keeps ordering cost plus holding cost as low as possible. A complete reorder policy for a SKU uses both.
What is a good forecast accuracy score?+
The calculator rates MAPE of 15% or less as excellent, up to 25% as good and up to 35% as fair, and treats bias within plus or minus 3% as minimal. Stable, fast-moving SKUs usually forecast more accurately than intermittent or new items, so compare like with like and watch whether the trend improves.
What inventory turnover ratio should I aim for?+
Aim for the typical range in your industry. The calculator shows 8–12 turns a year for retail, 4–8 for manufacturing, 6–12 for distribution, 8–15 for CPG, 2–5 for pharmaceutical and 8–20 for ecommerce. Well below the range usually means excess stock; well above it can mean safety stock is too thin.
Can I use these calculators for every SKU?+
You can, but the results are most reliable for SKUs with steady, continuous demand. The formulas assume demand that behaves fairly predictably, so intermittent, seasonal or new items need more care. For a large catalogue, running them by hand one SKU at a time is slow, which is where planning software helps.
How does Demand OS automate these calculations?+
Demand OS runs the same metrics at the SKU and location level across your catalogue. It tracks MAPE and bias as forecasts update, calculates safety stock from forecast error and supplier lead time history, adjusts order quantities as demand shifts and tracks turnover so slow movers are flagged. Recommendations go to planners for approval.
Perimattic Demand OS

Ready to automate these calculations?

Demand OS runs forecast accuracy, safety stock, EOQ, and inventory turnover at the SKU level across your entire catalogue — continuously, not once a quarter.
  • Free consultation
  • No commitment
  • Tailored to your team