How It Works
From Assessment to Go-Live in 90 Days
Intellyx follows a structured four-stage deployment — Connect, Deploy, Train, Go Live — that takes your factory from initial ERP integration to live dashboards and AI-powered alerts in 90 days. No production shutdown. No ERP replacement.
Intellyx deploys through a four-stage methodology: Connect (integrating existing ERP, PLCs, and data sources into a unified data layer), Deploy (installing hardware — sensors, cameras, and edge computing units — on the production floor), Train (calibrating AI models on production data and machine baselines), and Go Live (activating dashboards, automated reports, and WhatsApp alerts for all configured roles). The typical deployment timeline from site assessment to go-live is 60–90 days. No existing systems are replaced, and production does not need to stop during installation.
The 4-Stage Deployment Process
Each stage has defined deliverables and is completed before the next begins — ensuring a structured, predictable deployment.
Week 1–2
Connect
Integrate SAP, Tally, ERPNext, and PLCs into a unified data layer. Nothing replaced.
- •Site survey and machine inventory
- •ERP API / database access configured
- •PLC connectivity confirmed and mapped
Week 2–4
Deploy
Install sensors, monitoring devices, and vision QC cameras on the production line.
- •Edge servers and sensors installed on-site
- •Camera and lighting rigs mounted at inspection points
- •Network and data pipeline validated
Week 4–8
Train
AI models learn machine baseline, defect patterns, and production behaviour using data.
- •AI models trained on production data and defect samples
- •Machine health baselines established
- •Alert thresholds calibrated with factory team
Week 8–12
Go Live
Activate live dashboards, alerts, and factory intelligence tools.
- •Dashboards and reports activated for all roles
- •WhatsApp alert routing tested and confirmed
- •Operator and management training completed
What You Need to Prepare
Perimattic handles the deployment work — here is what we need from your side to keep the 90-day timeline on track.
ERP Access
Read-only API credentials or database access for your ERP system (SAP, Tally, ERPNext, or other). This allows Intellyx to pull production orders, shift schedules, and targets automatically.
Network Infrastructure
A stable LAN or industrial Ethernet network on the production floor connecting machines to the edge server. Wi-Fi is acceptable for non-critical data; wired is required for PLC connections.
Production Line Access
Perimattic engineers need access to the production floor for 2–5 days during hardware installation. This is typically scheduled during a maintenance window or weekend shutdown.
Sample Defect Parts (for Vision QC)
If Vision QC is included, 50–100 known-defective parts per defect type are needed for AI model training. Conforming parts are also required to establish the acceptance baseline. Production samples collected over 2–4 weeks of normal operation are sufficient.
Deployment FAQs
Do we need to stop production during installation?+
What IT infrastructure is required?+
How is operator training handled?+
What if deployment takes longer than 90 days?+
Can we deploy across multiple plants simultaneously?+
Schedule Your Factory Assessment
The deployment process starts with a free on-site or remote assessment to confirm the scope, timeline, and requirements for your factory. No commitment required.
Schedule Your Assessment →