Perimattic
AMC by equipment

DG set AMC: what a generator contract should cover

Servicing by running hours, the checks between services, and the contract terms that matter when the power goes out and the generator has to start.

Made for AMC service businessesBuilt for service businesses in India

Last updated 22 October 2026

Yellow industrial generator with its electrical panel open
Overview

What is a DG set AMC?

A DG set AMC is an annual maintenance contract for a diesel generator. It usually covers routine checks and test runs, oil and filter changes at the running-hour or calendar intervals in the engine manual, battery, coolant and fuel system care, and breakdown call-outs. A comprehensive contract also includes parts; a non-comprehensive one bills them separately.

Get started with Field Service Management

Sign up and our team will walk you through Perimattic Field Service Management for your service business: contracts, visits, breakdown tickets and renewals.

Sign up
Scope

What does a DG set AMC usually cover?

Exact tasks and intervals come from the engine and alternator manufacturers’ manuals. This is the usual scope of a contract:

ItemWhat is done
Oil and filter changesEngine oil, oil filter, fuel filter and air filter replaced at the intervals in the manual
BatteryTerminals cleaned, charge level and charger checked, battery replaced when weak (often excluded or billed separately)
Cooling systemCoolant level and condition, radiator cleaning, hoses and fan belt
Fuel systemLeaks, water in fuel, day-tank condition
Routine checks and test runsGauges, alarms, safety shutdowns and auto-start or changeover
Load testPeriodic run on site load or a load bank, where included
Breakdown call-outsAttending failures within the agreed response time
RecordsHour-meter reading, work done and parts used at every visit
Running hours

How does running-hours-based servicing work?

Engines wear with use, not with the calendar, so manuals set most service intervals in running hours. Because oil and coolant also age when a set stands idle, manuals usually add a calendar limit too: “every N hours or M months, whichever comes first”.

Illustrative: replace N and M with the figures in the engine manual.
SituationWhich trigger comes firstWhat the schedule must do
Standby set, rare power cutsCalendar limit (M months)Raise the service on the date even though hours are low
Set running daily during long power cutsHour limit (N hours)Read hours at each visit and bring the service forward
Prime-power set running most of the dayHour limit, quicklyPlan hour-based services as frequent fixed visits

The weak point is the hour reading. If technicians do not record it at every visit, the schedule cannot know when the next service is due. See preventive maintenance schedules for combining time and usage triggers.

Compliance

Do emission norms matter for a DG set AMC?

Emission and noise limits for gensets are set by Government notifications, listed on the CPCB genset notifications page. They include the emission limits for new diesel genset engines up to 800 kW notified as GSR 804(E) dated 3 November 2022, since amended by GSR 436(E) of 14 June 2023. These limits are certified when the engine is made; an AMC does not change a set’s certification. Good maintenance still matters, because clogged filters and poor injection raise smoke. Check with your State Pollution Control Board for any local rules on DG set use.

Row of green generator enclosures with tall exhaust stacks at an industrial site
Pricing

What drives the cost of a DG set AMC?

Cost driverWhy it moves the price
Rating (kVA)Larger engines take more oil, filters and technician time
Expected running hoursMore hours mean more services in the year
Comprehensive or notIncluding parts means pricing in expected failures
Consumables includedOil, filters and coolant can be a large share of cost
Battery coverBatteries are often excluded or capped because they wear out
Load bank testsHiring and transporting a load bank costs money
Response timeFaster SLAs need technicians on standby

Put your own numbers into the free AMC cost calculator to see the cost per contract and a suggested price.

Perimattic

How does Perimattic help DG set service businesses?

Perimattic Field Service Management is built for service businesses that sell AMCs, including DG set providers. It gives you an AMC register of customers, sites and sets with contract type and dates; preventive visits generated from each contract with reminders; breakdown tickets with SLA tracking; a technician app for checklists, photos and customer signature; spare parts used per visit; renewal reminders; and GST invoices for contract billing.

Sign up to tell us how you schedule hour-based services today.

Mechanic adjusting engine valve rockers with a wrench
FAQs

DG set AMCs, answered

How often should a DG set be serviced?

By running hours or calendar time, whichever comes first, as set in the engine manufacturer’s manual. A standby set that runs a few hours a month may reach the calendar limit first; a set running daily during power cuts will reach the hour limit first. Read the hour meter at every visit so the next service is triggered correctly.

Does a generator AMC include diesel?

Normally no. Fuel is the owner’s cost in almost every contract. Lubricating oil, filters and coolant may be included in a comprehensive AMC or billed as consumables in a non-comprehensive one, so check the contract wording.

Is a load test part of a DG set AMC?

It can be. Many contracts include a periodic run on load, or on a load bank where the site load is too small, to confirm the set can carry its rated output. Whether it is included, how often and who provides the load bank should be written into the contract.

Talk to our team

Want every AMC visit, ticket and renewal tracked in one place?

Sign up to tell us how your service team works, and our team will get in touch to show you how it fits.

Sign up